From: route@monster.com
Sent: Monday, January 18, 2016 4:23 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Inspector
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Anthony Strickland Continued Anthony Strickland 2952 Brockton Rd Jefferson, GA. 30549 Cell: (813) 516-7342 E-mail: astrick2000@yahoo.com OBJECTIVE:
An position with a growing telecommunications company in which I may use my
previous experience as a base to
grow.
EDUCATION:
Bay Springs High
School
Bay Springs,
Ms.
CERTIFICATIONS:
Diploma
1984
OPEDS Job Management
BST.CAD Microstation
Jones County Junior
College
Ellisville,
Ms.
ASCOPE I
Criminal
Investigation
1989
ASCOPE II
Basic Outside Plant Design Charlotte County
Vo-Tech
Pt Charlotte,
Fl
OSPCM-Engineering PC & Adv. PC
Repair
1996
EMPLOYMENT:
March 2005 to Present: A & M Automotive/
Owner Operator Duties:
Mobile mechanic, cars, trucks and motorcycles regular tune ups, rebuild
motors, head jobs, brakes , diagnostic, fuel
pumps, welding exhaust, minor welding on frame for tow bars October
2009 to April 2014: SunBelt Telecom / Network
Protection/Fiber Inspector Duties:
To locate and mark with flags and paint all fiber belonging to Level 3
Communications in Tampa Fl. and the Greater Atlanta area. To avoid cuts due
to ongoing construction and growth also to ride out my coverage area in case
of construction being performed without a call in ticket. Fiber inspector for
Qwest in Atlanta, GA
April 2008 to August 2009: Source One Corp. / Sr.
Project Engineer Bid
work for at&t VRAD, BAU work and road moves, locates and mark ups September
2007 to April 2008: Nelson’s Engineering Services
Inc. / Regional
Manager To
oversee day to day operations of the company business, schedule meeting, acquire contracts with different operating
companies, trouble shoot problems.Road moves using metro tech 810A… Clients
include BellSouth, Sprint/Nextel, AT&T, Embarq, Verizon, Qwest, and
Windstream. March
2007 to September 2007: Source One Corp. / Sr.
Project Engineer/ Fiber Inspector Design
the placement of fiber for AT&T’s Comp BB project also doing make ready
work for GDOT and Level 3 Communications and Inspection work for MCI and
Verizon Business. August
2005 to January 2007: North Star Communications. / Sr.
Project Engineer Design
the placement of backbone fiber and laterals for IPTV project, road moves
using Dynatel and DLC work in the New Orleans and Central Ms. areas. Bid Work
Client BellSouth. August
2004 to August 2005: Lambic Telcom / Sr.
Project Engineer Quality
control of F2 distribution engineering for FTTP project in the Ft Wayne, In.
for different vendors also to design using (F.I.T.S.) the placement of fiber
optic plant. Client Verizon. June 2004 to August
2004: Ameriss / OSP Project Engineer F2 distribution Engineer
for FTTP project in Northern Virginia. Design placement of fiber optic plant.
Client Verizon.
July 2001 to June 2004: MasTec NA / Assistant
Project Manager
Assist
in the overseeing the construction yard to make sure that all material is
accounted for also to issue weekly and daily reports using Excel, Word, and
Project as to how the construction crew is performing what material have been
used, ordering new materials also making sure that all my cad people have the
as-built information that they needed to complete there jobs. OSP Project
Engineer/ Inspector
Responsibilities
included verification of engineering on Fort Jackson Military base in
Columbia SC. Billy Mitchell Air Base in Milwaukee, WI. Buried and underground
plant for the new I3MP Project including all outside plant and inside plant
operations. Use of AutoCAD 2000 to update construction drawing, issuing
reports to the Project Manager using Excel and Word. February 1999 to July
2001: S.T.S./ Utility Locator Duties: To locate and
mark with paint and flags underground utilizes and meet with construction
crew to verify where work will be performed so no utilities are damaged. December 1997 to
February 1999: COMPLUS/ Inspector Documentation (Asbuilt,
Redlines) and re-engineering of the placement of HDPE and Fiber plant from
Indianapolis, In. to Chicago, IL. and from Detroit, MI. to Chicago, IL. Qwest
Project June 1989 to December
1997: P&S Consultants/ Field Engineer/ OSP
Project Engineer/ Fiber Inspector/Utility locator To take field notes for
aerial and buried plant as well as copper and long haul fiber across the Mid
Western and Eastern United States also feeder and distribution for carrier
system in Tallahassee, Fl. Span mapping and make ready for Rural telephone
companies. Southern Bell. Rea/RUS. Centel. Documentation (Asbuilt, Redlines)
and re-engineering of the placement of Fiber for Sprint and MCI/Worldcom October 1986 to July
1988: Metric/ Locator/ Fiber Inspector Documentation (Asbuilt,
Redlines) and re-engineering of the placement of Fiber plant from Mobile, Al.
to New Orleans La. Also from Greenville, S.C. to Atlanta, Ga. and Atlanta,
Ga. to Mobile, Al. For US Sprint. Locate and mark with paint and/or flags
buried copper and fiber plant using MetroTec 810, Dinatel, and Pipe Horn. July 1984 to August
1986: Fail Engineering/ Field Engineer To take field notes for
aerial and buried plant as well as copper and long haul fiber also to get ROW
for the placement of copper plant for growth. Rea/RUS |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|